| |

The Full ₹78,000 Solar Subsidy Roadmap – PM Surya Ghar Yojana Complete Guide (2026)

Step-by-step guide to PM Surya Ghar rooftop solar subsidy with ₹78,000 CFA

Introduction

Planning to install rooftop solar for your home but confused about the subsidy process?
The PM Surya Ghar: Muft Bijli Yojana (2026) is India’s biggest residential solar initiative, offering up to ₹78,000 subsidy for systems of 3 kW and above. On top of that, eligible households receive up to 300 units of free electricity every month.

This blog breaks down the complete roadmap, including eligibility, application steps, approved vendor requirements, and real-world pricing after subsidy.

PM Surya Ghar Subsidy Structure (2026)

The Central Financial Assistance (CFA) under the scheme is based on system capacity:

System SizeSubsidy Amount (₹)Notes
1 kW₹30,000Minimum eligible size
2 kW₹60,000Doubles CFA benefit
3 kW and above₹78,000 (maximum)Cap applies even for 4–10 kW systems

Key Highlight:
Whether you install 3 kW or 5 kW, the maximum subsidy remains ₹78,000.

State-Level Add-Ons (Example: Delhi Model)

Some states offer additional incentives.
Delhi Solar Policy Example:

Benefit TypeAmount
State Capital Subsidy₹10,000 per kW (max ₹30,000)
GBI (Generation-Based Incentive)₹3/unit for 4 years
Total Subsidy for 3 kW₹78,000 + ₹30,000 = ₹1,08,000

This makes Delhi one of the most cost-effective solar markets in India.

Step-by-Step PM Surya Ghar Yojana Application Process

1. Register on the National Portal

Visit the official portal:
https://pmsuryaghar.gov.in/

Choose:

  • State
  • District
  • Electricity DISCOM
  • Enter your consumer number to fetch details

2. Submit Rooftop Solar Application

Fill in details:

  • House ownership
  • Rooftop availability
  • Load connection

Important: You must not have taken any previous solar subsidy.

3. Select an Approved Vendor (Mandatory)

Your installation must be done by an MNRE-approved vendor listed on the national portal.

Solar Squad is fully compliant with:

  • ALMM/DCR norms
  • DISCOM technical standards
  • Subsidy disbursement protocol

👉 Book a Site Visit:
https://solarsquad.in/contact

4. Installation & Net Metering

Your vendor applies for:

  • Technical feasibility
  • Net metering
  • DISCOM inspection

5. Commissioning & Subsidy Release

After commissioning:

  • DISCOM uploads a verification report
  • Subsidy is released (usually adjusted in the final invoice)
  • Your net payable amount reduces automatically

Component-Wise Cost Breakdown (3 kW System Example)

ComponentBudget System (Mono PERC)Premium System (TOPCon)Notes
Solar Panels₹90,000 – ₹1,10,000₹1,20,000 – ₹1,35,000450–575W
Inverter (On-Grid)₹25,000 – ₹35,000₹40,000 – ₹55,000Growatt, Sungrow, Luminous
Mounting Structure₹12,000 – ₹18,000₹18,000 – ₹25,000HDGI/Aluminum
BOS & Wiring₹10,000 – ₹18,000₹15,000 – ₹22,000ACDB, DCDB, Cables
Installation₹15,000 – ₹22,000₹20,000 – ₹28,000Includes labor & commissioning
Total Cost (Pre-Subsidy)₹1,80,000 – ₹2,40,000Varies by quality

Net Cost After CFA (Subsidy)

Example calculation:

ItemAmount (₹)
Pre-Subsidy Cost₹2,13,300
CFA Subsidy-₹78,000
Final Payable₹1,35,300

In Delhi (with state subsidy):
Net cost can drop to ₹1,02,000.

Electricity Generation & Savings (3 kW Example)

  • Daily Generation: 12–14 units
  • Annual Generation: 4,300–5,000 units
  • Average Savings: ₹22,000 – ₹30,000/year
  • Lifetime Savings: ₹6–8 lakhs

Delhi users can also earn an additional ₹15,000 per year through GBI.

Payback Period & ROI

ScenarioNet Cost (₹)Annual Savings (₹)Payback (Years)
With CFA only1,35,00028,0004.3 years
With CFA + State Subsidy (Delhi)1,02,00038,0002.6 years

Solar ROI typically falls between 18%–25% annually.

Best Technology for Subsidy-Compliant Systems

TechnologyEfficiencyDegradationNotes
Mono PERC19–22%0.5–0.7%Budget-friendly
TOPCon22–24%0.25%Higher performance
HJT24–26%<0.2%Premium, long-term stability

Inverter Performance & Warranty

  • Efficiency: Up to 99%
  • Warranty:
    • Solar panels: 25 years
    • Inverter: 5–10 years
  • Replacement expected: Year 10–15

Operation & Maintenance Tips

  • Clean panels every 2–3 weeks
  • Get servicing once every 18–24 months
  • Monitor via inverter mobile app
  • Avoid shading during any sunlight hour

Regulatory Compliance & Documentation

Apply through the official portal:
👉 https://pmsuryaghar.gov.in/

Required documents:

  • Property proof
  • Electricity bill
  • ID proof
  • NOC (if tenant/shared roof)

Who Should Apply for the PM Surya Ghar Yojana Subsidy?

  • Homes with 150–600 units/month usage
  • Households wanting fast ROI
  • Homes planning to reduce bills by 70–90%
  • Users seeking long-term energy independence

3 kW Solar Price in Delhi After Subsidy

  • Base Cost: ₹1,90,000 – ₹2,20,000
  • Net Cost After CFA + State Subsidy: ₹1,02,000 – ₹1,15,000
  • Payback (With GBI): 2.3–2.8 years

Conclusion

The PM Surya Ghar Solar Subsidy is a financial breakthrough for Indian homeowners. With up to ₹78,000 subsidy, reduced upfront expenditure, and strong ROI, rooftop solar is now more accessible than ever. Installing through authorized vendors like Solar Squad ensures compliance, quality, and smooth subsidy processing.

Get a Free Quote from Solar Squad

Ready to install a 1–5 kW solar system under the PM Surya Ghar Yojana?
👉 Request a Free Quote: https://solarsquad.in/contact
(Replace with your real quote page URL)

FAQs

What is the maximum subsidy under PM Surya Ghar?

Up to ₹78,000 for systems 3 kW and above.

Who can apply for the subsidy?

Indian homeowners with a domestic electricity connection.

Who can apply for the subsidy?

No. Only on-grid (net metering) systems qualify.

How long does the subsidy take?

Typically 30–75 days.

Can I choose any vendor?

No. You must install through an MNRE-approved vendor on the national portal.

Does Delhi offer extra subsidy?

Yes — up to ₹30,000 extra + GBI incentives.


Discover more from Solar Squad

Subscribe to get the latest posts sent to your email.

Similar Posts

Leave a Reply